| Responsible group | Reference▲ | Subject | Scope | Current Status | Remarks | Start | End | Actions |
|
SE
| BWA_2 | EC Mandate on BWA | To develop CEPT response to EC Mandate on BWA |
Finalized
| WI is closed (JPT BWA is closed) |
2006-02-01
|
2008-02-29
|
|
|
FM
| EFIS/MG_01 | EFIS/MG | Further development of EFIS. |
In Progress
| Amenmends to the ECC Decision(01)03 on EFIS adopted by the May 10 meeting for publication. |
2008-05-20
|
2012-05-20
|
|
|
FM
| FM_01 | European Common Allocation Table (ERC Report 25) | Implementation of ERC Report 25 |
Finalized
| Proposals for the ECA update will be considered at the next WG FM meeting in Sept 10. Rensponses to the questionnaire on the future use and objective of the ECA Table will be further analysed. |
2006-01-01
|
2012-01-01
|
|
|
FM
| FM22_02 | Power Line Communications / Use of the LF, MF and HF bands | Ensure appropriate protection of Radio Service |
Finalized
| PTFM 22 will look to develop a standard method of measuring emissions from PLC. Nothing to report at the Jan 10 WGFM meeting. |
2005-01-01
|
2008-12-31
|
|
|
FM
| FM22_03 | Monitoring campaign on SRD in 863-870 MHz | The campaign aims to collect information to assess whether congestion in band is such that additional spectrum must be made available for the continued correct operation of SRDs |
Finalized
| 2nd phase of the monitoring campaign was finalised and the results have been reported to SRD/MG. |
2008-09-20
|
2009-05-20
|
|
|
FM
| FM22_04 | New ECC Rec “Measurement of Disturbance Field from Telecommunication System and Networks” | To develop a New ECC Rec on measurement of disturbance field from telecommunication system and networks |
Finalized
| New ECC Rec “measurement of Disturbance Field from Telecommunication System and Networks” adopted by Oct 09 FM meeting for publication |
2008-05-20
|
2009-12-31
|
|
|
FM
| FM22_05 | BEM compliance measurements | Development of recommendation on BEM copliance measurements |
In Progress
| Draft Recommendation consists of one cover sheet, one general Annex 1 and an Annex 2 on BEM measurements related to WIMAX, presented at May10 meeting, further annexes may be developed |
2009-01-01
|
2012-12-31
|
|
|
FM
| FM38_03 | Public Protection and Disaster Relief (PPDR) | Possible new ECC deliverables on PPDR |
In Progress
| Identify additional spectrum for narrow and wide band PPDR in 380-470MHz, continue studies on broad band issues and identify spectrum for broad band PPDR. Possible revision of ECC Dec(08)05. |
2008-01-01
|
2012-12-31
|
|
|
FM
| FM38_04 | GSM-R | Extention bands for GSM-R |
In Progress
| Studies on GSM-R are ongoing in ECC PT1 and in SE PT7 |
2008-09-01
|
2012-12-31
|
|
|
FM
| FM38_05 | CB Radio | Examine the posibility to allow FM and AM modulations with 4W and SSB with 12 W (PEP) throughout CEPT |
In Progress
| PT38 will sart to develope a new ECC Decision on CB radio at its Sept10 meeting and study the actual demand for the proposed changes. |
2010-05-21
|
2010-05-21
|
|