Go back to the Home Page Print this page View the User Guide of this application

    
Page 1 of 11
Responsible groupReferenceSubjectScopeCurrent StatusRemarksStartEndActions
SE BWA_2EC Mandate on BWATo develop CEPT response to EC Mandate on BWA Finalized WI is closed (JPT BWA is closed) 2006-02-01 2008-02-29
FM EFIS/MG_01EFIS/MGFurther development of EFIS. In Progress Amenmends to the ECC Decision(01)03 on EFIS adopted by the May 10 meeting for publication. 2008-05-20 2012-05-20
FM FM_01European Common Allocation Table (ERC Report 25)Implementation of ERC Report 25 Finalized Proposals for the ECA update will be considered at the next WG FM meeting in Sept 10. Rensponses to the questionnaire on the future use and objective of the ECA Table will be further analysed. 2006-01-01 2012-01-01
FM FM22_02Power Line Communications / Use of the LF, MF and HF bandsEnsure appropriate protection of Radio Service Finalized PTFM 22 will look to develop a standard method of measuring emissions from PLC. Nothing to report at the Jan 10 WGFM meeting. 2005-01-01 2008-12-31
FM FM22_03Monitoring campaign on SRD in 863-870 MHzThe campaign aims to collect information to assess whether congestion in band is such that additional spectrum must be made available for the continued correct operation of SRDs Finalized 2nd phase of the monitoring campaign was finalised and the results have been reported to SRD/MG. 2008-09-20 2009-05-20
FM FM22_04New ECC Rec “Measurement of Disturbance Field from Telecommunication System and Networks”To develop a New ECC Rec on measurement of disturbance field from telecommunication system and networks Finalized New ECC Rec “measurement of Disturbance Field from Telecommunication System and Networks” adopted by Oct 09 FM meeting for publication 2008-05-20 2009-12-31
FM FM22_05BEM compliance measurementsDevelopment of recommendation on BEM copliance measurements In Progress Draft Recommendation consists of one cover sheet, one general Annex 1 and an Annex 2 on BEM measurements related to WIMAX, presented at May10 meeting, further annexes may be developed 2009-01-01 2012-12-31
FM FM38_03Public Protection and Disaster Relief (PPDR)Possible new ECC deliverables on PPDR In Progress Identify additional spectrum for narrow and wide band PPDR in 380-470MHz, continue studies on broad band issues and identify spectrum for broad band PPDR. Possible revision of ECC Dec(08)05. 2008-01-01 2012-12-31
FM FM38_04GSM-RExtention bands for GSM-R In Progress Studies on GSM-R are ongoing in ECC PT1 and in SE PT7 2008-09-01 2012-12-31
FM FM38_05CB RadioExamine the posibility to allow FM and AM modulations with 4W and SSB with 12 W (PEP) throughout CEPT In Progress PT38 will sart to develope a new ECC Decision on CB radio at its Sept10 meeting and study the actual demand for the proposed changes. 2010-05-21 2010-05-21
Display : Records per page
 Page 1 of 11  
Show Page :